Challenge: A staggering $3M spent on fastening technology with zero improvement in bolted joint failures.
Solution: Implementation of PINpoint MES, transforming process oversight and enforcing stringent quality controls.
Results:
- 94% Reduction in bolted joint failures.
- Sustained Improvement
- Powerful Insights
Unlock the full story behind this remarkable turnaround. Learn the strategies that led to significant savings and improved quality.